Resource Graphics & Downloads
These uploaded graphics and PDFs have been added as FloodPath support resources for mitigation, GCF, basement restrictions, and post-inspection guidance.
Structural Drying / W-13025A
Resources for explaining FEMA Bulletin W-13025A structural drying guidance, drying logs, basement/lower-level limitations, crawlspace/exposed-area limitations, and non-payable equipment considerations.

Structural Drying Guidance
Process and limitations overview.

Basement Drying Payability
What is and is not payable to dry in a basement under SFIP.
GCF Documentation
Quick visual definition and key criteria for explaining general and temporary flooding.

GCF Definition / Key Criteria
Two or more acres or properties, temporary, inundation present, and adjoining-property consideration.
Basement Guidance
Quick-reference basement guidance PDF summarizing the SFIP basement definition, limited basement building items, limited basement contents, and common property not insured in a basement.
Post-Inspection Next Steps
One-page insured-facing graphic for after the on-site inspection is complete.

Next Steps & Important Information
Inspection completed, policyholder duties, continued documentation, prior flood loss docs, contents, mailing address, SPOL, and mortgagee reminders.
Basement & PFE Restricted Area Resources
Additional quick-reference PDFs for basement restrictions and covered building items below the lowest elevated floor of a Post-FIRM Elevated building.
Official FEMA / NFIP Linked Source Summary
The linked FEMA/NFIP sources from your guidance emails have been converted into a dedicated source-summary page.
Contents Resources
Downloadable contents instructions, Xact-compatible Excel spreadsheet, and printable handwritten contents worksheet.
Use / Disclaimer
These materials are for general claim communication and documentation guidance only. Field adjusters cannot approve/deny coverage or authorize payment. Final claim decisions are made only by the Carrier.